Power Systems Critical mass is maximum mass of fissionable material required to sustain a chain reaction. a mass of fissionable material required to stop a chain reaction. none of these. minimum mass of fissionable material required to sustain chain reaction. maximum mass of fissionable material required to sustain a chain reaction. a mass of fissionable material required to stop a chain reaction. none of these. minimum mass of fissionable material required to sustain chain reaction. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 710 MW. 720 MW. 730 MW. 740 MW. 710 MW. 720 MW. 730 MW. 740 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Cooling tower. Pulverising unit. Wind turbine. Condenser. Cooling tower. Pulverising unit. Wind turbine. Condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where do compounding done in thermal power plants Generator. Ash handling plant. Coal handling plant. Turbine. Generator. Ash handling plant. Coal handling plant. Turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mercury is choice with steam in binary vapor cycle because higher saturation temperature than other fluids. higher critical temperature and pressure. all of above. relative low vaporization pressure. higher saturation temperature than other fluids. higher critical temperature and pressure. all of above. relative low vaporization pressure. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The term self GMD is used to calculate capacitance inductance both 1 and 2 resistance capacitance inductance both 1 and 2 resistance ANSWER DOWNLOAD EXAMIANS APP