Power Systems Which of the following is not base load power plant Nuclear. Diesel. Run water. Pump storage. Nuclear. Diesel. Run water. Pump storage. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main objectives of electrical power transmission is/are Transmission system must be more efficient with minimum line losses Voltage regulation of the transmission line must be zero or minimum nether 1 nor 2 both 1 and 2 Transmission system must be more efficient with minimum line losses Voltage regulation of the transmission line must be zero or minimum nether 1 nor 2 both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Water hamming process in pen-stocks results in pressure increases. noise increases. None of these noise increases, pressure increases, velocity decreases. pressure increases. noise increases. None of these noise increases, pressure increases, velocity decreases. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j6 pu j3 pu j9 pu j1 pu j6 pu j3 pu j9 pu j1 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generator has reactances of sub transient (X")= 0.5 pu, transient (X') = 0.8 pu and synchronous reactance (X) = 5 pu. The voltages at these reactances are 1.2 V, 1.1 V and 1 V respectively. Find the corresponding sub transient fault current in pu? 2.4 pu 0.2 pu 3.975 pu 1.375 pu 2.4 pu 0.2 pu 3.975 pu 1.375 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power system consists of 300 buses out of which 20 buses are generator buses, 25 buses are the ones with reactive power support buses and 15 buses are ones with fixed shunt capacitors. All the other buses are load buses. It is proposed to perform a load flow analysis for the system using Newton-Raphson Jacobian matrix is 540×540 555×555 553×553 554×554 540×540 555×555 553×553 554×554 ANSWER DOWNLOAD EXAMIANS APP