Power Systems A power station plant load factor is defined as the ratio of minimum load to average load the energy generated to that of maximum energy that could have been generated average load to the peak load minimum load to peak load minimum load to average load the energy generated to that of maximum energy that could have been generated average load to the peak load minimum load to peak load ANSWER DOWNLOAD EXAMIANS APP
Power Systems One fission of U235 releases energy of 200 MeV. 525 MeV. 435 MeV. 335 MeV. 200 MeV. 525 MeV. 435 MeV. 335 MeV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In order to have lower cost of power generaion the load factor and diversity factor should be low The load factor and diversity factor should be high the load factor should be high but diversity factor should be low the load factor should be low but diversity factor should be high the load factor and diversity factor should be low The load factor and diversity factor should be high the load factor should be high but diversity factor should be low the load factor should be low but diversity factor should be high ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rating of CB is in terms of voltage. current. VAR. volt - ampere. voltage. current. VAR. volt - ampere. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reflector of a nuclear reactor are made up of cast iron. steel. boron. beryllium. cast iron. steel. boron. beryllium. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The factor affecting run off are all of above. amount of vegetation and weather condition in the catchment area. rain fall pattern, shape and size of catchment area. the topography and nature of soil in the catchment area. all of above. amount of vegetation and weather condition in the catchment area. rain fall pattern, shape and size of catchment area. the topography and nature of soil in the catchment area. ANSWER DOWNLOAD EXAMIANS APP