Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. 56 %. 28 %. 14 %. None of above 56 %. 28 %. 14 %. None of above ANSWER DOWNLOAD EXAMIANS APP
Power Systems Earth fault relay uses the which of the following sequence currents? zero sequence positive sequence negative sequence any of the above zero sequence positive sequence negative sequence any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems For variable heads of near about but less than 30 m, which type of turbines is used hydro power plant Francis. Pelton. None of above. Kaplan. Francis. Pelton. None of above. Kaplan. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An hydro-graph indicates the discharge at any time during the period under consideration. All of these the average run off during the period. the maximum and minimum run off during the period. the discharge at any time during the period under consideration. All of these the average run off during the period. the maximum and minimum run off during the period. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Consider a three phase, 50 Hz, 11 kV distribution system. Each of the conductors is suspended by an insulator string having two identical porcelain insulators. The self capacitance of the insulators is 5 times the shunt capacitance between the link and ground. Find the voltage across the two insulators V1 and V2? (V1 = Voltage of disc nearest to the conductor) V1 = 2.89 kV and V2 = 3.46 kV V1 = 6 kV and V2 = 5 kV V1 = 3.46 kV and V2 = 2.89 kV V1 = 5 kV and V2 = 6 kV V1 = 2.89 kV and V2 = 3.46 kV V1 = 6 kV and V2 = 5 kV V1 = 3.46 kV and V2 = 2.89 kV V1 = 5 kV and V2 = 6 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants normally operage at high speeds Thermal. Diesel engine. Hydro electric. Petrol engine. Thermal. Diesel engine. Hydro electric. Petrol engine. ANSWER DOWNLOAD EXAMIANS APP