Power Systems A 100 Km long transmission line is loaded at 110 kV. If the loss of line is 5 MW and the load is 150 VA the resistance of the line is 2.26 Ω / phase. 6.06 Ω / phase. 8.06 Ω / phase. 4.65 Ω / phase. 2.26 Ω / phase. 6.06 Ω / phase. 8.06 Ω / phase. 4.65 Ω / phase. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which statement is not correct for the transmission line parameter R, L, G and C The line parameter R,L,G and C are uniformly distributed along the entire length of the line C. For each line, the conductors are characterized by σ c, μ c, εo = ε c and the homog At high frequencies at which most of communication system operate the internal inductance of the conductor is neglected. G = I/R. R is the AC resistance per unit length of conductor C. The line parameter R,L,G and C are uniformly distributed along the entire length of the line C. For each line, the conductors are characterized by σ c, μ c, εo = ε c and the homog At high frequencies at which most of communication system operate the internal inductance of the conductor is neglected. G = I/R. R is the AC resistance per unit length of conductor C. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following relays is/are unit protection relays? Buccholz relays both 1 and 2 over current relays Differential relays Buccholz relays both 1 and 2 over current relays Differential relays ANSWER DOWNLOAD EXAMIANS APP
Power Systems The charging reactance of 50 km transmission line is 1500 Ω. What is the charging reactance for 100 km length of line? 750 Ω 1500 Ω 3000 Ω 1000 Ω 750 Ω 1500 Ω 3000 Ω 1000 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems Units of incremental cost is RsMW/hr MWhr/Rs Rs/hr Rs/MWhr RsMW/hr MWhr/Rs Rs/hr Rs/MWhr ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW ANSWER DOWNLOAD EXAMIANS APP