Power Systems Which of the following methods is/are used for reactive or voltage compensation All of these generation excitation control shunt capacitor series capacitor All of these generation excitation control shunt capacitor series capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Thermal. Gas-turbine. Nuclear. Hydro Power Plant Thermal. Gas-turbine. Nuclear. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Based on the discharge, Kaplan turbine will discharge >10000 lpm 1000 lpm >10000 lpm 1000 lpm ANSWER DOWNLOAD EXAMIANS APP
Power Systems Generation of of one watt needs about ______________ fission per second 3.1 × 107. 3.1 × 106. 3.1 × 1010. 3.1. 3.1 × 107. 3.1 × 106. 3.1 × 1010. 3.1. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power and the transmission line is compensated with a series capacitance of 0.5 Pu. Find the load angle with series capacitance compensation ? 29° 35.5° 10.5° 14.5° 29° 35.5° 10.5° 14.5° ANSWER DOWNLOAD EXAMIANS APP
Power Systems One fission of U235 releases energy of 435 MeV. 200 MeV. 335 MeV. 525 MeV. 435 MeV. 200 MeV. 335 MeV. 525 MeV. ANSWER DOWNLOAD EXAMIANS APP