Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j1 pu j9 pu j6 pu j3 pu j1 pu j9 pu j6 pu j3 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems In load flow studies PV bus is treated as PQ bus when reactive power goes beyond limit voltage at the bus become high any of the above phase angle become high reactive power goes beyond limit voltage at the bus become high any of the above phase angle become high ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of shunt compensation is/are All of these single unit can be used as both capacitance and inductor by adjusting the excitation smooth voltage regulation is possible by controlling excitation It requires less maintanance All of these single unit can be used as both capacitance and inductor by adjusting the excitation smooth voltage regulation is possible by controlling excitation It requires less maintanance ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Thermal. Gas turbine. Hydro Power Plant Nuclear. Thermal. Gas turbine. Hydro Power Plant Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Based on the discharge, Kaplan turbine will discharge 1000 lpm >10000 lpm 1000 lpm >10000 lpm ANSWER DOWNLOAD EXAMIANS APP
Power Systems Asynchronous tie line is a None of these AC transmission line DC transmission line either 1 or 2 None of these AC transmission line DC transmission line either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP