Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j6 pu j9 pu j3 pu j1 pu j6 pu j9 pu j3 pu j1 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Cheapest plant in operation and maintenance is diesel power. hydroelectric. nuclear. steam power. diesel power. hydroelectric. nuclear. steam power. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following rotor is used in thermal power plants? either of these salient pole rotor squirrel cage rotor cylindrical rotor either of these salient pole rotor squirrel cage rotor cylindrical rotor ANSWER DOWNLOAD EXAMIANS APP
Power Systems For symmetrical network, the neutral current is zero infinity any of the above maximum zero infinity any of the above maximum ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power transfer capability of transmission line can be increased by Using series capacitance Using bundled conductors All of these Parallel transmission lines Using series capacitance Using bundled conductors All of these Parallel transmission lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mechanical energy is supplied to a DC generator at the rate of 4200 J / S. The generator delivers 32.2 Amp at 120 V. How much energy is cost per minute of operation 20060 J. 23060 J. 25060 J. 20160 J. 20060 J. 23060 J. 25060 J. 20160 J. ANSWER DOWNLOAD EXAMIANS APP