Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Nuclear. Gas-turbine. Hydro Power Plant Thermal. Nuclear. Gas-turbine. Hydro Power Plant Thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Asynchronous tie line is a None of these either 1 or 2 AC transmission line DC transmission line None of these either 1 or 2 AC transmission line DC transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems A synchronous generator is of 100 MVA have inertia constant of 20 MJ/MVA. Find the angular momentum in MJsec/electrical degrees 5 2000 0.22 0.4 5 2000 0.22 0.4 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Capacitance voltage transformer ( CVT ) is used to connect instruments on the LT side. reduce losses in a transmission line. none of these. improve the power factor of the transmission. connect instruments on the LT side. reduce losses in a transmission line. none of these. improve the power factor of the transmission. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Thermal power plant. Nuclear power plant. Hydro electric power plant. Gas turbine plant. Thermal power plant. Nuclear power plant. Hydro electric power plant. Gas turbine plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Making and breaking currents of 3 phase AC circuit breakers in power system are respectively in what form? RMS and Instantaneous value any of the above RMS and RMS value Instantaneous and RMS value RMS and Instantaneous value any of the above RMS and RMS value Instantaneous and RMS value ANSWER DOWNLOAD EXAMIANS APP