Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Nuclear. Thermal. Gas-turbine. Hydro Power Plant Nuclear. Thermal. Gas-turbine. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under over excitation synchronous phase modifier works as shunt reactor series capacitor shunt capacitor any of the above shunt reactor series capacitor shunt capacitor any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a surge impedance of 400 Ω is connected with the cable having surge impedance of 40 Ω, a surge magnitude of 100 kV is travelling from the transmission line towards the cable. Find the reflected voltage? 81.82 kV -18.18 kV 18.18 kV -81.82 kV 81.82 kV -18.18 kV 18.18 kV -81.82 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power stations is mainly used to cover peak load on the system? nuclear plant coal based thermal power plant pumped storage hydro power plant gas based thermal power plant nuclear plant coal based thermal power plant pumped storage hydro power plant gas based thermal power plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Incremental cost of two generators Ic1 = 0.2 P1+60, Ic2 = 0.3 P2+40 and the ratings of the generator are 150 and 250 MW. Find the load sharing of each generator for a load of 200 MW? P1 = 100 MW, P2 = 100 MW P1 = 60 MW, P2 = 140 MW P1 = 80 MW, P2 = 120 MW P1 = 120 MW, P2 = 80 MW P1 = 100 MW, P2 = 100 MW P1 = 60 MW, P2 = 140 MW P1 = 80 MW, P2 = 120 MW P1 = 120 MW, P2 = 80 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The term self GMD is used to calculate both 1 and 2 capacitance resistance inductance both 1 and 2 capacitance resistance inductance ANSWER DOWNLOAD EXAMIANS APP