Power Systems A 100 MVA alternator operating at full load at 50 Hz. H = 4 MWsec/MVA, Td = 0.5 sec. One of the transmission line is tripped. So that output of generator is reduced to 70 MW. Find the frequency deviation during this time? -0.92 0.92 0.56 -0.56 -0.92 0.92 0.56 -0.56 ANSWER DOWNLOAD EXAMIANS APP
Power Systems India’s largest thermal power station is located at Kota. Sarni. Chandrapur. Neyveli. Kota. Sarni. Chandrapur. Neyveli. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Peak load station. Base load station. Minimum load station. None of above. Peak load station. Base load station. Minimum load station. None of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the number of strands of ACSR conductor for 4 layer transmission line? 37 7 29 1 37 7 29 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading can be increased by increasing of voltage level increasing of capacitance value increasing of inductance value both 1 and 2 increasing of voltage level increasing of capacitance value increasing of inductance value both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems For variable heads of near about but less than 30 meters, which type of turbine is used in hydro power station? None of these Kaplan Pelton Francis None of these Kaplan Pelton Francis ANSWER DOWNLOAD EXAMIANS APP