Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates stop proceed None of these proceed cautiously stop proceed None of these proceed cautiously ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When the rail ends rest on a joint sleeper, the joint is termed as bridge joint supported rail joint base joint suspended rail joint bridge joint supported rail joint base joint suspended rail joint ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Lead of crossing is the distance from the toe of the switch to the theoretical nose of crossing heel of the switch to the toe of the switch toe of the switch to the actual nose of crossing heel of the switch to the theoretical nose of the crossing toe of the switch to the theoretical nose of crossing heel of the switch to the toe of the switch toe of the switch to the actual nose of crossing heel of the switch to the theoretical nose of the crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally maximum cant permissible in Meter Gauge is 75 mm 140 mm 90 mm 165 mm 75 mm 140 mm 90 mm 165 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Fish plate is in contact with rail at foot of rail web of rail head of rail fishing plane foot of rail web of rail head of rail fishing plane ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Maximum value of ‘throw of switch’ for Broad Gauge track is 100 mm 95 mm 115 mm 89 mm 100 mm 95 mm 115 mm 89 mm ANSWER DOWNLOAD EXAMIANS APP