Railway Engineering Maximum value of ‘throw of switch’ for Broad Gauge track is 95 mm 115 mm 89 mm 100 mm 95 mm 115 mm 89 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 35 mm/sec 20 mm/sec 65 mm/sec 55 mm/sec 35 mm/sec 20 mm/sec 65 mm/sec 55 mm/sec ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The nominal size of ballast used for points and crossings is 10 mm 40 mm 25 mm 50 mm 10 mm 40 mm 25 mm 50 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a scissors cross-over, the crossings provided arei) 2 obtuse angle crossingsii) 4 obtuse angle crossingsiii) 4 acute angle crossingsiv) 6 acute angle crossingsThe correct answer is (i) and (iii) (i)and(iv) (ii) and (iv) (ii) and (iii) (i) and (iii) (i)and(iv) (ii) and (iv) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (iii) and (iv) (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP