Estimating and Costing The plinth area of a building not includes Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of the walls at the floor level Area of cantilevered porch Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of the walls at the floor level Area of cantilevered porch ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every 30 m intervals At every change of direction At every change of gradient All of these At every 30 m intervals At every change of direction At every change of gradient All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Top of P trap W.C. Main soil pipe Side of water closet Bottom of P trap W.C. Top of P trap W.C. Main soil pipe Side of water closet Bottom of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Octagonal buildings Circular buildings Hexagonal buildings All of these Octagonal buildings Circular buildings Hexagonal buildings All of these ANSWER DOWNLOAD EXAMIANS APP