Estimating and Costing The brick work is not measured in cu m in case of One or more than one brick wall Brick work in arches Reinforced brick work Half brick wall One or more than one brick wall Brick work in arches Reinforced brick work Half brick wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Fully in excavation Partly in excavation and partly in embankment All of these Fully in embankment Fully in excavation Partly in excavation and partly in embankment All of these Fully in embankment ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating a reinforced cement structure, the omitted cover of concrete is assumed For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar All of these In thin slabs, 12 mm minimum or diameter of the bar whichever is more For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar All of these In thin slabs, 12 mm minimum or diameter of the bar whichever is more ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate W' Area Room area Courtyard area Wall thickness W' Area Room area Courtyard area Wall thickness ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3300 m³ 3225 m³ 3275 m³ 3250 m³ 3300 m³ 3225 m³ 3275 m³ 3250 m³ ANSWER DOWNLOAD EXAMIANS APP