Estimating and Costing

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

Courtyard area
Wall thickness
W' Area
Room area

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is

3300 m³
3250 m³
3225 m³
3275 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

2.5 m³
1.5 m³
3.5 m³
5.0 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

12°
14°
10°
8°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

Cutting
Excavation
Surface excavation
Surface dressing

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Cost of fittings and their fixing is specified for the following sanitary fittings

Lavatory basins
All listed here
Flushing pipes
Water closets

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑