Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 2 and 3 are correct 3 and 4 are correct I and 2 are correct 1 and 4 are correct 2 and 3 are correct 3 and 4 are correct I and 2 are correct 1 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of dog spikes normally used per rail seat on curved track is one on either side two outside and two inside one outside and two inside two outside and one inside one on either side two outside and two inside one outside and two inside two outside and one inside ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 60 R rails are mostly used in Narrow Gauge None of these Broad Gauge Metre Gauge Narrow Gauge None of these Broad Gauge Metre Gauge ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 5 2 1 10 5 2 1 10 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.432 cm 7.768 cm 0.168 cm -0.168 cm 7.432 cm 7.768 cm 0.168 cm -0.168 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The distance through which the tongue rail moves laterally at the toe of the switch for movement of trains is called flangeway clearance heel divergence None of these throw of the switch flangeway clearance heel divergence None of these throw of the switch ANSWER DOWNLOAD EXAMIANS APP