Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements I and 2 are correct 3 and 4 are correct 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 65 mm/sec 35 mm/sec 20 mm/sec 55 mm/sec 65 mm/sec 35 mm/sec 20 mm/sec 55 mm/sec ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 6.10 m 10.82 m 10.21m 8.84 m 6.10 m 10.82 m 10.21m 8.84 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally maximum cant permissible in Meter Gauge is 75 mm 165 mm 90 mm 140 mm 75 mm 165 mm 90 mm 140 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following mechanical devices is used to ensure that route cannot be changed while the train is on the point even after putting back the signal ? detectors point lock stretcher bar iock bar detectors point lock stretcher bar iock bar ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which one of the following rail failures is caused by loose fish bolts at expansion joints? split head angular break crushed head transverse fissures split head angular break crushed head transverse fissures ANSWER DOWNLOAD EXAMIANS APP