Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct I and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct I and 2 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates None of these stop proceed cautiously proceed None of these stop proceed cautiously proceed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The nominal size of ballast used for points and crossings is 50 mm 25 mm 10 mm 40 mm 50 mm 25 mm 10 mm 40 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Gauge is the distance between None of these running faces of rails center to center of rails outer faces of rails None of these running faces of rails center to center of rails outer faces of rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 35 mm/sec 65 mm/sec 20 mm/sec 55 mm/sec 35 mm/sec 65 mm/sec 20 mm/sec 55 mm/sec ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates proceed proceed cautiously stop None of these proceed proceed cautiously stop None of these ANSWER DOWNLOAD EXAMIANS APP