Railway Engineering Yellow lighthand signal indicates None of these proceed cautiously proceed stop None of these proceed cautiously proceed stop ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct I and 2 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The side slope of embankments for a railway track is generally taken as 1.5:1 1:1 2:1 1:2 1.5:1 1:1 2:1 1:2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 28.49 m 14.24 m 7.45 m 21.04 m 28.49 m 14.24 m 7.45 m 21.04 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally the limiting value of cant is (where G is the gauge.) G/15 G/8 G/12 G/10 G/15 G/8 G/12 G/10 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1850/R 1600/R 1750/R 1700/R 1850/R 1600/R 1750/R 1700/R ANSWER DOWNLOAD EXAMIANS APP