Railway Engineering A triangle is used for Transferring wagons to and from parallel tracks without shunting Separating all the sidings and shunting lines from main lines Preventing the vehicles from running off the track Changing the direction of engine Transferring wagons to and from parallel tracks without shunting Separating all the sidings and shunting lines from main lines Preventing the vehicles from running off the track Changing the direction of engine ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The sleepers resting directly on girder are fastened to the top flange of girder by rail screws fang bolts dog spikes hook bolts rail screws fang bolts dog spikes hook bolts ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates None of these proceed cautiously proceed stop None of these proceed cautiously proceed stop ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a B.G. railway track, the specified ruling gradent is 1 in 250. The horizontal curve of 3° on a gradient of 1 in 250 will have the permissible gradient of 1 in 512 1 in 357 1 in 457 1 in 257 1 in 512 1 in 357 1 in 457 1 in 257 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The maximum degree of curvature for Meter Gauge is limited to 40° 30° 16° 10° 40° 30° 16° 10° ANSWER DOWNLOAD EXAMIANS APP