Waste Water Engineering The laying of sewers is done with Theodolite Clinometer Level Magnetic compass Theodolite Clinometer Level Magnetic compass ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as A main sewer A trunk sewer An intercepting sewer An outfall sewer A main sewer A trunk sewer An intercepting sewer An outfall sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If q is the average sewage flow from a city of population P, the maximum sewage flow Q = [(18 + )/(4 + )] q Q = [(18 + P)/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(4 + )/(18 + )] q Q = [(18 + )/(4 + )] q Q = [(18 + P)/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(4 + )/(18 + )] q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage may become stale in One hour Six hours Two to three hours Three to four hours One hour Six hours Two to three hours Three to four hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Concreting Raising low lying areas by dumping Both A and B Neither A nor B Concreting Raising low lying areas by dumping Both A and B Neither A nor B ANSWER DOWNLOAD EXAMIANS APP