Waste Water Engineering The laying of sewers is done with Clinometer Magnetic compass Level Theodolite Clinometer Magnetic compass Level Theodolite ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as A main sewer An intercepting sewer An outfall sewer A trunk sewer A main sewer An intercepting sewer An outfall sewer A trunk sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If q is the average sewage flow from a city of population P, the maximum sewage flow Q = [(18 + P)/(4 + )] q Q = [(4 + )/(18 + )] q Q = [(18 + )/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(18 + P)/(4 + )] q Q = [(4 + )/(18 + )] q Q = [(18 + )/(4 + )] q Q = [(5 + )/((15 + )] q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage may become stale in Three to four hours One hour Six hours Two to three hours Three to four hours One hour Six hours Two to three hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Concreting Raising low lying areas by dumping Both A and B Neither A nor B Concreting Raising low lying areas by dumping Both A and B Neither A nor B ANSWER DOWNLOAD EXAMIANS APP