Waste Water Engineering The laying of sewers is done with Magnetic compass Theodolite Clinometer Level Magnetic compass Theodolite Clinometer Level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as An intercepting sewer An outfall sewer A trunk sewer A main sewer An intercepting sewer An outfall sewer A trunk sewer A main sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If q is the average sewage flow from a city of population P, the maximum sewage flow Q = [(5 + )/((15 + )] q Q = [(18 + P)/(4 + )] q Q = [(18 + )/(4 + )] q Q = [(4 + )/(18 + )] q Q = [(5 + )/((15 + )] q Q = [(18 + P)/(4 + )] q Q = [(18 + )/(4 + )] q Q = [(4 + )/(18 + )] q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage may become stale in Three to four hours One hour Two to three hours Six hours Three to four hours One hour Two to three hours Six hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Both A and B Neither A nor B Concreting Raising low lying areas by dumping Both A and B Neither A nor B Concreting Raising low lying areas by dumping ANSWER DOWNLOAD EXAMIANS APP