Waste Water Engineering The laying of sewers is done with Level Magnetic compass Clinometer Theodolite Level Magnetic compass Clinometer Theodolite ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The standard B.O.D. of water is taken for 5 days 2 days 3 days 1 day 5 days 2 days 3 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 2 days 14 days 7 days 12 days 2 days 14 days 7 days 12 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The discharge per unit plan area of a sedimentation tank, is generally called Over flow velocity Over flow rate All of these Surface loading Over flow velocity Over flow rate All of these Surface loading ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewage, the solids in mg per litre is 100 to 500 1000 to 1500 1500 to 2000 500 to 1000 100 to 500 1000 to 1500 1500 to 2000 500 to 1000 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design purposes, the normal rate of infiltration of ground water into the sewer, is 1500 litres/km/cm 2000 litres/km/cm 500 litres/km/cm 1000 litres/km/cm 1500 litres/km/cm 2000 litres/km/cm 500 litres/km/cm 1000 litres/km/cm ANSWER DOWNLOAD EXAMIANS APP