Waste Water Engineering The grit and silt of the grit chambers, may not be used for Neither A nor B Raising low lying areas by dumping Concreting Both A and B Neither A nor B Raising low lying areas by dumping Concreting Both A and B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewage is pumped up From flat areas All listed here From low lying areas From basements From flat areas All listed here From low lying areas From basements ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If D is the diameter of a circular sewer and D’ is the top horizontal diameter of an equivalent egg shaped section, the relationship which holds good, is D’ = 0.74 D D’ = 0.84 D D’ = 0.94 D D’ = 0.64 D D’ = 0.74 D D’ = 0.84 D D’ = 0.94 D D’ = 0.64 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For estimating the peak run off the rational formula Q = 0.0278 KpA was evolved by All listed here Kinchling Lloyd Davis Frubling All listed here Kinchling Lloyd Davis Frubling ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 2 minutes 3 minutes 1 minute 5 minutes 2 minutes 3 minutes 1 minute 5 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If a 2% solution of sewage sample is incubated for 5 days at 20°C and the dissolved oxygen depletion was found to be 8 mg/l. The BOD of the sewage is 400 mg/l 300 mg/l 200 mg/l 100 mg/l 400 mg/l 300 mg/l 200 mg/l 100 mg/l ANSWER DOWNLOAD EXAMIANS APP