Waste Water Engineering No treatment of the sewage is given if dilution factor is Between 150 to 200 Less than 150 Between 200 to 300 More than 500 Between 150 to 200 Less than 150 Between 200 to 300 More than 500 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is 20 m 16 m 30 m 24 m 20 m 16 m 30 m 24 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewers, inverted siphon is provided for Three pipes Four pipes One pipe Two pipes Three pipes Four pipes One pipe Two pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Chlorination of water is done for the removal of Bacterias Suspended solids Sediments Hardness Bacterias Suspended solids Sediments Hardness ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage may become stale in Six hours Three to four hours Two to three hours One hour Six hours Three to four hours Two to three hours One hour ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The small sewers are cleaned by Wooden pills None of these Cane rodding Flushing Wooden pills None of these Cane rodding Flushing ANSWER DOWNLOAD EXAMIANS APP