Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as An intercepting sewer A trunk sewer A main sewer An outfall sewer An intercepting sewer A trunk sewer A main sewer An outfall sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The first stage of neutral process of sludge digestion, is Alkaline fermentation Acid regression None of these Acid fermentation Alkaline fermentation Acid regression None of these Acid fermentation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Oxidation Irrigation Purification Dilution Oxidation Irrigation Purification Dilution ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If q is the average sewage flow from a city of population P, the maximum sewage flow Q = [(5 + )/((15 + )] q Q = [(18 + )/(4 + )] q Q = [(18 + P)/(4 + )] q Q = [(4 + )/(18 + )] q Q = [(5 + )/((15 + )] q Q = [(18 + )/(4 + )] q Q = [(18 + P)/(4 + )] q Q = [(4 + )/(18 + )] q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Chlorination of water is done for the removal of Hardness Suspended solids Sediments Bacterias Hardness Suspended solids Sediments Bacterias ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering hydraulically equivalent, the relationship which holds good, is D3/8 = 4 b3/8 D2/3 = 4 b2/3 D3/2 = 4 b3/2 D8/3 = 4 b8/3 D3/8 = 4 b3/8 D2/3 = 4 b2/3 D3/2 = 4 b3/2 D8/3 = 4 b8/3 ANSWER DOWNLOAD EXAMIANS APP