Waste Water Engineering In sewers the effect of scouring is more on Horizontal side Bottom side Top side All sides Horizontal side Bottom side Top side All sides ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In septic tanks, The clear space between the baffle top and covering slab is about 7.5 cm All listed here The baffles or tees are extended up to top level of scum Free board of 0.3 m may be provided The clear space between the baffle top and covering slab is about 7.5 cm All listed here The baffles or tees are extended up to top level of scum Free board of 0.3 m may be provided ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Removal of oil and grease from sewage, is known Filtration None of these Skimming Screening Filtration None of these Skimming Screening ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bottom openings 15 cm × 15 cm in the standing baffle wall are provided 50 cm c/c 22.5 cm c/c 30 cm c/c 15 cm c/c 50 cm c/c 22.5 cm c/c 30 cm c/c 15 cm c/c ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most widely used pump for lifting sewage is Air pressure pump Reciprocating pump Pneumatic ejector Centrifugal pump Air pressure pump Reciprocating pump Pneumatic ejector Centrifugal pump ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 8 to 16 hours 24 to 36 hours 16 to 24 hours 4 to 8 hours 8 to 16 hours 24 to 36 hours 16 to 24 hours 4 to 8 hours ANSWER DOWNLOAD EXAMIANS APP