Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for A particle to travel along its length None of these A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank A particle to travel along its length None of these A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following tests is used for testing sewer pipes? Water test Mirror test All of these Ball test Water test Mirror test All of these Ball test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Aerobic activity is maximum None of these At sewer pipes In freshly produced sewage In sewer treatment plants None of these At sewer pipes In freshly produced sewage In sewer treatment plants ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Floating materials are removed by screening Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks All listed here Floating materials are removed by screening Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Boussinesq’s equation for ascertaining unit pressure at a depth on sewers due to traffic loads, is pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 ANSWER DOWNLOAD EXAMIANS APP