Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for The flow of sewage to fill the tank None of these A particle to travel along its length A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank None of these A particle to travel along its length A particle to travel from top surface to bottom sludge zone ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following tests is used for testing sewer pipes? Ball test Water test All of these Mirror test Ball test Water test All of these Mirror test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Aerobic activity is maximum In sewer treatment plants None of these In freshly produced sewage At sewer pipes In sewer treatment plants None of these In freshly produced sewage At sewer pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Floating materials are removed by screening Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks All listed here Floating materials are removed by screening Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Boussinesq’s equation for ascertaining unit pressure at a depth on sewers due to traffic loads, is pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 ANSWER DOWNLOAD EXAMIANS APP