Waste Water Engineering The moisture content of sludge is reduced from 90% to 80% in a sludge digestion tank. The percentage decrease in the volume of sludge, is 0.25 0.1 0.5 0.05 0.25 0.1 0.5 0.05 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 1 3 to 5 2 to 3 5 to 10 1 3 to 5 2 to 3 5 to 10 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers Top of smaller sewer is kept lower None of these Top of larger sewer is kept lower Tops of both the sewers are at the same level Top of smaller sewer is kept lower None of these Top of larger sewer is kept lower Tops of both the sewers are at the same level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most effective arrangement for diverting excess storm water into a natural drainage, is Overflow weir None of these Leaping weir Siphon spill way Overflow weir None of these Leaping weir Siphon spill way ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Imhoff cone is used to determine Dissolved solids None of these Settleable solids Suspended solids Dissolved solids None of these Settleable solids Suspended solids ANSWER DOWNLOAD EXAMIANS APP