Waste Water Engineering The moisture content of sludge is reduced from 90% to 80% in a sludge digestion tank. The percentage decrease in the volume of sludge, is 0.05 0.5 0.25 0.1 0.05 0.5 0.25 0.1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 1 3 to 5 5 to 10 2 to 3 1 3 to 5 5 to 10 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers None of these Top of larger sewer is kept lower Top of smaller sewer is kept lower Tops of both the sewers are at the same level None of these Top of larger sewer is kept lower Top of smaller sewer is kept lower Tops of both the sewers are at the same level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most effective arrangement for diverting excess storm water into a natural drainage, is Overflow weir Siphon spill way Leaping weir None of these Overflow weir Siphon spill way Leaping weir None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Imhoff cone is used to determine Suspended solids None of these Dissolved solids Settleable solids Suspended solids None of these Dissolved solids Settleable solids ANSWER DOWNLOAD EXAMIANS APP