Waste Water Engineering
At the junction of sewers

Top of smaller sewer is kept lower
Tops of both the sewers are at the same level
None of these
Top of larger sewer is kept lower

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In case of sewer lines

All listed here
Obstruction test is carried out with the help of smooth ball of diameter 13 mm
Test for straightness is carried out with the help of a lamp and mirror
Water test is carried out to check water tightness of the joints

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Nitrogen cycle of sewage, is

Formation of nitrates-formation of nitrites-liberation of nitrates-liberation of nitrates
Liberation of nitrogen-formation of nitrates-formation of nitrites-liberation of ammonia
Liberation of ammonia-formation of nitrites-formation of nitrates-liberation of nitrogen
Liberation of nitrogen-liberation of ammonia-formation of nitrites- formation of nitrates

ANSWER DOWNLOAD EXAMIANS APP