Waste Water Engineering The screens are fixed Parallel to the direction of flow At an angle 30° to 60° to the direction of flow Perpendicular to the direction of flow None of these Parallel to the direction of flow At an angle 30° to 60° to the direction of flow Perpendicular to the direction of flow None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Primary treatment of sewage consists of removal of Floating materials Oil and grease Large suspended organic solids Sand and girt Floating materials Oil and grease Large suspended organic solids Sand and girt ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In circular sewers if depth of flow is 0.2 times the full depth, the nominal gradient, Is trebled Is not enough Is only provided Is doubled Is trebled Is not enough Is only provided Is doubled ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the over land flow from the critical point to the drain is 8 km and the difference in level is 12.4 m, the inlet time is 5 hours 3 hours 4 hours 2 hours 5 hours 3 hours 4 hours 2 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 3.0 ml of raw sewage is diluted to 300 ml. The D.O. concentration of the diluted sample at the beginning of the test was 8 mg/l. After 5 day-incubation at 20°C, the D.O. concentration was 5 mg/l. The BOD of raw sewerage is 300 mg/l 100 mg/l 400 mg/l 200 mg/l 300 mg/l 100 mg/l 400 mg/l 200 mg/l ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 5 to 10 3 to 5 2 to 3 1 5 to 10 3 to 5 2 to 3 1 ANSWER DOWNLOAD EXAMIANS APP