Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Nitrites are formed Nitrates are formed Carbondioxide is formed Ammonia is formed Nitrites are formed Nitrates are formed Carbondioxide is formed Ammonia is formed ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The porosity of sediments in sewer pipes, is usually taken as 0.011 0.01 0.013 0.012 0.011 0.01 0.013 0.012 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of 120 cm 100 cm 140 cm 160 cm 120 cm 100 cm 140 cm 160 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of a spherical particle of diameter less than 0.1 mm as per Stock’s law, is Vs = 418 (Gs – Gw)d² [(3T + 70)/100] Vs = 218 (Gs – Gw)d² [(3T + 70)/100] Vs = 218 (Gs – Gw)d [(3T + 70)/100] Vs = 418 (Gs – Gw) d [(3T + 70)/100] Vs = 418 (Gs – Gw)d² [(3T + 70)/100] Vs = 218 (Gs – Gw)d² [(3T + 70)/100] Vs = 218 (Gs – Gw)d [(3T + 70)/100] Vs = 418 (Gs – Gw) d [(3T + 70)/100] ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is Hydrogen All listed here Carbon dioxide Ammonia Hydrogen All listed here Carbon dioxide Ammonia ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bottom openings 15 cm × 15 cm in the standing baffle wall are provided 15 cm c/c 22.5 cm c/c 30 cm c/c 50 cm c/c 15 cm c/c 22.5 cm c/c 30 cm c/c 50 cm c/c ANSWER DOWNLOAD EXAMIANS APP