Waste Water Engineering During preliminary treatment of a sewage Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers Floating materials are removed by screening All listed here Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers Floating materials are removed by screening All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is d² (0.011d + 0.785H)/Q d (0.285d + 0.011H)/Q d (0.022d + 0.085H)/Q d (0.785d + 0.011H)/Q d² (0.011d + 0.785H)/Q d (0.285d + 0.011H)/Q d (0.022d + 0.085H)/Q d (0.785d + 0.011H)/Q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer that unloads the sewage at the point of treatment is called Main sewer Outfall sewer Branch sewer House sewer Main sewer Outfall sewer Branch sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 7 m 5.5 m 5 m 6.5 m 7 m 5.5 m 5 m 6.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For estimating the peak run off the rational formula Q = 0.0278 KpA was evolved by Kinchling Lloyd Davis Frubling All listed here Kinchling Lloyd Davis Frubling All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer running partially full and hurried with back filled, fails in compression due to Superimposed traffic loads Weight of the pipe Weight of the back fill All listed here Superimposed traffic loads Weight of the pipe Weight of the back fill All listed here ANSWER DOWNLOAD EXAMIANS APP