Waste Water Engineering House connections to the laterals is generally made by P.C.C. Glazed stonewares Cast iron R.C.C. P.C.C. Glazed stonewares Cast iron R.C.C. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The disintegrating pump in which solid matter is broken up before passing out, is None of these Centrifugal pump Pneumatic ejector Reciprocating pump None of these Centrifugal pump Pneumatic ejector Reciprocating pump ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is d² (0.011d + 0.785H)/Q d (0.022d + 0.085H)/Q d (0.285d + 0.011H)/Q d (0.785d + 0.011H)/Q d² (0.011d + 0.785H)/Q d (0.022d + 0.085H)/Q d (0.285d + 0.011H)/Q d (0.785d + 0.011H)/Q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Floating materials are removed by screening Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers All listed here Floating materials are removed by screening Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Design period of 40 to 50 years is adopted for Trunk sewers All listed here Main sewers Branch sewers Trunk sewers All listed here Main sewers Branch sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If 2% solution of a sewage sample is incubated for 5 days at 20°C and depletion of oxygen was found to be 5 ppm, B.O.D. of the sewage is 225 ppm 250 ppm 200 ppm None of these 225 ppm 250 ppm 200 ppm None of these ANSWER DOWNLOAD EXAMIANS APP