Waste Water Engineering The sewer which transports the sewage to the point of treatment, is called Main sewer Out-fall sewer House sewer Branch sewer Main sewer Out-fall sewer House sewer Branch sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at Three fourth full Full depth Half full Two third full Three fourth full Full depth Half full Two third full ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The disintegrating pump in which solid matter is broken up before passing out, is Centrifugal pump None of these Pneumatic ejector Reciprocating pump Centrifugal pump None of these Pneumatic ejector Reciprocating pump ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The gas which may cause explosion in sewers, is Carbon monoxide Ammonia Carbondioxide Methane Carbon monoxide Ammonia Carbondioxide Methane ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for Unexpected increase in the population Unexpected large scale infiltration of stream water Under estimates of maximum and average flows All of these Unexpected increase in the population Unexpected large scale infiltration of stream water Under estimates of maximum and average flows All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, All listed here Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated All listed here Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated ANSWER DOWNLOAD EXAMIANS APP