Waste Water Engineering Aerobic activity is maximum At sewer pipes In sewer treatment plants In freshly produced sewage None of these At sewer pipes In sewer treatment plants In freshly produced sewage None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars of perforations of fine screens used for the treatment of sewage, is 2 to 3 mm 8 to 10 mm 5 to 8 mm 3 to 5 mm 2 to 3 mm 8 to 10 mm 5 to 8 mm 3 to 5 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The amount of oxygen consumed by the aerobic bacterias which cause the aerobic biological decomposition of sewage, is known Chemical Oxygen Demand (C.O.D.) Bio-Chemical Oxygen Demand (B.O.D.) None of these Dissolved Oxygen (D.O.) Chemical Oxygen Demand (C.O.D.) Bio-Chemical Oxygen Demand (B.O.D.) None of these Dissolved Oxygen (D.O.) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The suitable cross-section of sewers to carry combined flow, is Rectangular Egg shaped Horse shoe shaped Circular Rectangular Egg shaped Horse shoe shaped Circular ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the discharge of a sewer running half is 628 1.p.s., i = 0.001, and n = 0.010, the diameter of the sewer, is 1.49 m 1.69 m 1.39 m 1.59 m 1.49 m 1.69 m 1.39 m 1.59 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the side of a square sewer is 1000 mm, the diameter of a hydraulically equivalent circular section, is 1045 mm 1075 mm 1095 mm 1065 mm 1045 mm 1075 mm 1095 mm 1065 mm ANSWER DOWNLOAD EXAMIANS APP