Waste Water Engineering In trickling filter, B.O.D. is reduced to 60 to 80% 30 to 40% 80 to 90% 40 to 60% 60 to 80% 30 to 40% 80 to 90% 40 to 60% ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is Hydrogen All listed here Ammonia Carbon dioxide Hydrogen All listed here Ammonia Carbon dioxide ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Inter-distance between ventilation columns in a sewer line is kept 25 to 50 m 150 m to 300 m 50 m to 100 m 100 m to 150 m 25 to 50 m 150 m to 300 m 50 m to 100 m 100 m to 150 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most efficient cross-section of sewers in a combined sewerage system is Parabolic New egged Circular Rectangular Parabolic New egged Circular Rectangular ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for Under estimates of maximum and average flows Unexpected large scale infiltration of stream water Unexpected increase in the population All of these Under estimates of maximum and average flows Unexpected large scale infiltration of stream water Unexpected increase in the population All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Removal of oil and grease from sewage, is known Filtration Skimming Screening None of these Filtration Skimming Screening None of these ANSWER DOWNLOAD EXAMIANS APP