Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following types of sleepers is preferred on joints ? concrete sleeper steel trough sleeper CST-9 sleeper wooden sleeper concrete sleeper steel trough sleeper CST-9 sleeper wooden sleeper ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Study the following statements regarding creep.i) Creep is greater on curves than on tangent railway track,ii) Creep in new rails is more than that in old rails,iii) Creep is more on steep gradients than on level track.The correct answer is (ii) and (iii) (i)and(ii) only (i) (i), (ii) and (iii) (ii) and (iii) (i)and(ii) only (i) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The nominal size of ballast used for points and crossings is 40 mm 10 mm 25 mm 50 mm 40 mm 10 mm 25 mm 50 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Anti creep bearing plates are provided on joints bridges and approaches None of these both (A) and (B) joints bridges and approaches None of these both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP