Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 8.84 m 10.21m 10.82 m 6.10 m 8.84 m 10.21m 10.82 m 6.10 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Heel divergence is Equal to flange-way clearance Sometimes greater than flange-way clearance Always greater than flange-way clearance Always less than flange-way clearance Equal to flange-way clearance Sometimes greater than flange-way clearance Always greater than flange-way clearance Always less than flange-way clearance ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Creep is the Lateral movement of rail Longitudinal movement of rail Vertical movement of rail Difference in level of two rails Lateral movement of rail Longitudinal movement of rail Vertical movement of rail Difference in level of two rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is 1 2 None of these 3 1 2 None of these 3 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering If a is the angle of crossing, then the number of crossings āNā according to right angle method is given by Vi cosec(a/2) Vi cot(cc/2) cot(a) cot(oc/2) Vi cosec(a/2) Vi cot(cc/2) cot(a) cot(oc/2) ANSWER DOWNLOAD EXAMIANS APP