Railway Engineering Number of cotters used in CST-9 sleepers is 3 5 4 2 3 5 4 2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided On curves When two different rail sections are required to be joined None of these On straight track On curves When two different rail sections are required to be joined None of these On straight track ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the center of arm of a semaphore signal above the ground is 8.5m 5.5m 7.5 m 6.5 m 8.5m 5.5m 7.5 m 6.5 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are (ii) and (iii) (i)and(ii) (i) and (iii) only (i) (ii) and (iii) (i)and(ii) (i) and (iii) only (i) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The shape of transition curve used by Indian Railways is spiral lemniscate of Bernoulli sine curve cubic parabola spiral lemniscate of Bernoulli sine curve cubic parabola ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The maximum degree of curvature for Meter Gauge is limited to 30° 10° 16° 40° 30° 10° 16° 40° ANSWER DOWNLOAD EXAMIANS APP