Highway Engineering The rail is designated by its length weight per unit length weight cross-section length weight per unit length weight cross-section ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Los Angeles testing machine is used to conduct Abrasion test Crushing strength test Impact test Attrition test Abrasion test Crushing strength test Impact test Attrition test ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of shoulders in water bound macadam roads is equal to the cross slope of pavement zero less than the cross slope of pavement greater than the cross slope of pavement equal to the cross slope of pavement zero less than the cross slope of pavement greater than the cross slope of pavement ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The percentage compensation in gradient for ruling gradient of 4% and horizontal curve of radius 760 m is 0.1 % 10% 1 % no compensation 0.1 % 10% 1 % no compensation ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The attainment of super elevation by rotation of pavement about the inner edge of the pavement results in balancing the earthwork avoids the drainage problem in flat terrain is preferable in steep terrain does not change the vertical alignment of road results in balancing the earthwork avoids the drainage problem in flat terrain is preferable in steep terrain does not change the vertical alignment of road ANSWER DOWNLOAD EXAMIANS APP