Building Construction The number of steps in a flight generally should not be less than 5 No limit 2 3 5 No limit 2 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation in which a cantilever beam is provided to join two footings, is known as Strap footing Raft footing Combined footing Strip footing Strap footing Raft footing Combined footing Strip footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 10 mm 40 mm 20 mm 30 mm 10 mm 40 mm 20 mm 30 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Underpinning Shoring Jacking Scaffolding Underpinning Shoring Jacking Scaffolding ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for foundations, is 30 to 125 mm 25 to 50 mm 50 to 100 mm 75 to 125 mm 30 to 125 mm 25 to 50 mm 50 to 100 mm 75 to 125 mm ANSWER DOWNLOAD EXAMIANS APP