Building Construction The number of steps in a flight generally should not be less than 3 2 No limit 5 3 2 No limit 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/8th of the span 1/6th of the span 1/12th of the span 1/10th of the span 1/8th of the span 1/6th of the span 1/12th of the span 1/10th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Dubbing Hacking Blistering Peeling Dubbing Hacking Blistering Peeling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known Sinking piles Raking piles Construction piles Eccentric piles Sinking piles Raking piles Construction piles Eccentric piles ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 3 1 : 2 1 : 4 1 : 1 1 : 3 1 : 2 1 : 4 1 : 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A solid core of rock is formed inside the cylinder in the case of Percussion drilling Wash boring Diamond drilling Auger boring Percussion drilling Wash boring Diamond drilling Auger boring ANSWER DOWNLOAD EXAMIANS APP