Building Construction The arrangement made to support an unsafe structure temporarily, is known as Underpinning Scaffolding Jacking Shoring Underpinning Scaffolding Jacking Shoring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The member which is placed horizontally to support common rafter of a sloping roof, is Cleat Batten Strut Purlin Cleat Batten Strut Purlin ANSWER DOWNLOAD EXAMIANS APP
Building Construction Suitable spacing of timber piles, is 90 cm 80 cm 70 cm 100 cm 90 cm 80 cm 70 cm 100 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A stair should not have pitch more than 40° 30° 50° 25° 40° 30° 50° 25° ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm Hinders the ground water observations and permeability test All listed here Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm Hinders the ground water observations and permeability test All listed here ANSWER DOWNLOAD EXAMIANS APP