Building Construction
Which one of the following activities is not correct as applicable to brick corbels

The maximum projection of each corbel course should be limited to a quarter brick at a time
The discontinuous corbels are used to carry heavy concentrated loads
The maximum projection of the corbel should not be more than the thickness of the wall
Stretcher bond is generally used for the construction of brick corbel

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Raft foundations are used for:

Counter acting the hydrostatic effect
All listed here
Spanning over small soft or loose pockets
Providing increased area of foundation over poor bearing capacity of soil

ANSWER DOWNLOAD EXAMIANS APP