Building Construction Which one of the following activities is not correct as applicable to brick corbels Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The function of cleats in a roof truss is To prevent the purlins from tilting All of these To support the common rafter To support purlins To prevent the purlins from tilting All of these To support the common rafter To support purlins ANSWER DOWNLOAD EXAMIANS APP
Building Construction The alignment of a cross joint along the plumb line is Perpend Bed block Lintel Vertical line Perpend Bed block Lintel Vertical line ANSWER DOWNLOAD EXAMIANS APP
Building Construction A cut in frame of a door to receive the shutter, is called Louver Horn Rebate Stop Louver Horn Rebate Stop ANSWER DOWNLOAD EXAMIANS APP
Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Midway ground level and water-table level Water table level Ground level Plinth level Midway ground level and water-table level Water table level Ground level Plinth level ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required A base course is prepared as in cement concrete flooring A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required A base course is prepared as in cement concrete flooring A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling ANSWER DOWNLOAD EXAMIANS APP