Building Construction Which of the following metal sheets is most effective in preventing dampness? Aluminium sheets Copper sheets All listed here Lead sheets Aluminium sheets Copper sheets All listed here Lead sheets ANSWER DOWNLOAD EXAMIANS APP
Building Construction A temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as Scaffolding Raking shore Dead shore Under pinning Scaffolding Raking shore Dead shore Under pinning ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Dubbing Hacking Blistering Peeling Dubbing Hacking Blistering Peeling ANSWER DOWNLOAD EXAMIANS APP
Building Construction An arch may fail due to Uneven settlement of abutments Sliding of voussoirs All listed here Crushing of the material Uneven settlement of abutments Sliding of voussoirs All listed here Crushing of the material ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 1 meter 2 meters 3 meters 4 meters 1 meter 2 meters 3 meters 4 meters ANSWER DOWNLOAD EXAMIANS APP