Building Construction Single Flemish bond consists of Double Flemish bond facing and English bond backing in each course Double Flemish bond facing and header bond backing in each course Stretcher bond facing and double Flemish bond backing in each course English bond facing and double Flemish bond backing in each course Double Flemish bond facing and English bond backing in each course Double Flemish bond facing and header bond backing in each course Stretcher bond facing and double Flemish bond backing in each course English bond facing and double Flemish bond backing in each course ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 1 day 4 days 7 days 14 days 1 day 4 days 7 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wall constructed to resist the pressure of an earth filling, is called Retaining wall Parapet wall Breast wall Buttress Retaining wall Parapet wall Breast wall Buttress ANSWER DOWNLOAD EXAMIANS APP
Building Construction The range of spread from the wall base to outer edge of a brick work foundation does not exceed 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical 1 horizontal to 1 vertical 2 horizontals to 1 vertical 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical 1 horizontal to 1 vertical 2 horizontals to 1 vertical ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.75 du 1.5 du 1.25 du 1.35 du 1.75 du 1.5 du 1.25 du 1.35 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction The member which is placed horizontally to support common rafter of a sloping roof, is Cleat Strut Batten Purlin Cleat Strut Batten Purlin ANSWER DOWNLOAD EXAMIANS APP