Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.35 du 1.5 du 1.75 du 1.25 du 1.35 du 1.5 du 1.75 du 1.25 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction The thickness of a reinforced brick partition wall, is generally kept 5 cm 10 cm 15 cm 20 cm 5 cm 10 cm 15 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statement about silt soil from the following: The silt soil has particle size from 0.02 mm to 0.06 mm In organic fine grained silt soil possesses no plasticity The least plastic type normally consists of more or less equidimensional grains of quartz All listed here The silt soil has particle size from 0.02 mm to 0.06 mm In organic fine grained silt soil possesses no plasticity The least plastic type normally consists of more or less equidimensional grains of quartz All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wooden block hinged on post outside a door, is known Stop None of these Cleat Horn Stop None of these Cleat Horn ANSWER DOWNLOAD EXAMIANS APP
Building Construction Mansard roof is a roof which slopes in Two directions with break in the slope on each side Two directions without break in the slope on each side Four directions with break in the slope on each side Four directions without break in the slope on each side Two directions with break in the slope on each side Two directions without break in the slope on each side Four directions with break in the slope on each side Four directions without break in the slope on each side ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads Stretcher bond is generally used for the construction of brick corbel The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads Stretcher bond is generally used for the construction of brick corbel ANSWER DOWNLOAD EXAMIANS APP