Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.75 du 1.25 du 1.35 du 1.5 du 1.75 du 1.25 du 1.35 du 1.5 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 5 No limit 2 3 5 No limit 2 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used Franki pile Pedestal pile Pressure pile Vibro pile Franki pile Pedestal pile Pressure pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The taper of precast concrete pile should not be more than 5 cm per metre length 4 cm per metre length 2 cm per metre length 1 cm per metre length 5 cm per metre length 4 cm per metre length 2 cm per metre length 1 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 2, 1, 3, 5, 4 5, 4, 3, 2, 1 3, 2, 5, 1, 4 1, 2, 3, 4, 5 2, 1, 3, 5, 4 5, 4, 3, 2, 1 3, 2, 5, 1, 4 1, 2, 3, 4, 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The maximum projection of each corbel course should be limited to a quarter brick at a time The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The maximum projection of each corbel course should be limited to a quarter brick at a time ANSWER DOWNLOAD EXAMIANS APP