Building Construction The form work from the underside of slabs, can be removed only after 14 days 7 days 4 days 1 day 14 days 7 days 4 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 60° 0° 30° 90° 60° 0° 30° 90° ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Newel posts Railings Balustrades Balusters Newel posts Railings Balustrades Balusters ANSWER DOWNLOAD EXAMIANS APP
Building Construction To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as Stretcher Bat Closer Header Stretcher Bat Closer Header ANSWER DOWNLOAD EXAMIANS APP
Building Construction Herringbone bond is used for Ornamental panels in brick flooring Architectural finish to the face work All of these Walls having thickness more than 4 bricks Ornamental panels in brick flooring Architectural finish to the face work All of these Walls having thickness more than 4 bricks ANSWER DOWNLOAD EXAMIANS APP