Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Rafter Ridge Crown Eave Rafter Ridge Crown Eave ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling All listed here Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm All listed here Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Blistering Peeling Dubbing Hacking Blistering Peeling Dubbing Hacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundations are placed below ground level, to increase Workability All listed here Strength Stability of structure Workability All listed here Strength Stability of structure ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile provided with one or more bulles in its vertical shaft, is generally known as Friction pile Bearing pile Sheet pile Under-ream pile Friction pile Bearing pile Sheet pile Under-ream pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum number of steps in a flight should generally be restricted to 15 12 No limit 10 15 12 No limit 10 ANSWER DOWNLOAD EXAMIANS APP