Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Placing of concrete Curing of concrete Compaction of concrete Finishing of concrete Placing of concrete Curing of concrete Compaction of concrete Finishing of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction In flat roof of reinforced cement concrete, the recommended angle of slope, is A few degrees Zero 10° 200° A few degrees Zero 10° 200° ANSWER DOWNLOAD EXAMIANS APP
Building Construction During percussion drilling All listed here Caving or mixing of strata are caused in soft soils or cohesion-less soils Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole The soil to a considerable depth below the bottom of the hole gets disturbed All listed here Caving or mixing of strata are caused in soft soils or cohesion-less soils Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole The soil to a considerable depth below the bottom of the hole gets disturbed ANSWER DOWNLOAD EXAMIANS APP
Building Construction The width of the hollow space between two walls of a cavity wall should not exceed 7.5 cm 10 cm 15 cm 5 cm 7.5 cm 10 cm 15 cm 5 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is 6 cm 2 cm 8 cm 4 cm 6 cm 2 cm 8 cm 4 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The entrained concrete is used in lining walls and roofs for making Sound insulated Neither (A) nor (B) Heat insulated Both (A) and (B) Sound insulated Neither (A) nor (B) Heat insulated Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP