Building Construction If (φ) is the angle of repose of soil of weight w kg/m3, the horizontal pressure p at a depth of h meters per metre length of wall, is wh × √[(1 + sin φ)/(1 - sin φ)] (wh/2) × [(1 - sin φ)/(1 + sin φ)] wh × √[(1 - sin φ)/(1 + sin φ)] wh × [(1 - sin φ)/(1 + sin φ)] wh × √[(1 + sin φ)/(1 - sin φ)] (wh/2) × [(1 - sin φ)/(1 + sin φ)] wh × √[(1 - sin φ)/(1 + sin φ)] wh × [(1 - sin φ)/(1 + sin φ)] ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical members fixed between steps and hand rail, are known Soffits Strings Balusters Newel posts Soffits Strings Balusters Newel posts ANSWER DOWNLOAD EXAMIANS APP
Building Construction The opening provided in sloping roof with its top parallel to the roof surface, is called Sky light window Lantern window Louvered window Dormer window Sky light window Lantern window Louvered window Dormer window ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than 2 No limit 3 5 2 No limit 3 5 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling is the fastest method in case of Clay soils Sandy soil Rocky soils All of these Clay soils Sandy soil Rocky soils All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm All listed here Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm All listed here ANSWER DOWNLOAD EXAMIANS APP