Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required ANSWER DOWNLOAD EXAMIANS APP
Building Construction The projections of head or sill of a door or window frame are Transoms Stops Horns Chocks Transoms Stops Horns Chocks ANSWER DOWNLOAD EXAMIANS APP
Building Construction The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known Raking piles Eccentric piles Construction piles Sinking piles Raking piles Eccentric piles Construction piles Sinking piles ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pointing in which a V-shaped projection outside the wall surface, is provided, is called V-pointing Weather pointing Tuck pointing Recessed pointing V-pointing Weather pointing Tuck pointing Recessed pointing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than One-third the column spacing Half the column spacing Three-fourth the column spacing The column spacing One-third the column spacing Half the column spacing Three-fourth the column spacing The column spacing ANSWER DOWNLOAD EXAMIANS APP
Building Construction Mansard roof is a roof which slopes in Four directions without break in the slope on each side Four directions with break in the slope on each side Two directions with break in the slope on each side Two directions without break in the slope on each side Four directions without break in the slope on each side Four directions with break in the slope on each side Two directions with break in the slope on each side Two directions without break in the slope on each side ANSWER DOWNLOAD EXAMIANS APP