Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material Glass strips are driven into the layer according to the pattern required ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 14 days 3 days 7 days 21 days 14 days 3 days 7 days 21 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The radial splits which are wider on the outside of the log and narrower towards the pith are known as Heart shakes Starshakes Rindgalls Cupshakes Heart shakes Starshakes Rindgalls Cupshakes ANSWER DOWNLOAD EXAMIANS APP
Building Construction The sound which continues even after its source is cut off, is called Echo Intensity of sound Reverberation Interference Echo Intensity of sound Reverberation Interference ANSWER DOWNLOAD EXAMIANS APP
Building Construction In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used Vibro pile Franki pile Pressure pile Pedestal pile Vibro pile Franki pile Pressure pile Pedestal pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Floating Dubbing out Blistering Knitting Floating Dubbing out Blistering Knitting ANSWER DOWNLOAD EXAMIANS APP