Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Boning rod Steel tape Ranging rod Levelling staff Boning rod Steel tape Ranging rod Levelling staff ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil can be improved by Draining the soil Grouting Compacting the soil Increasing the depth of foundation Draining the soil Grouting Compacting the soil Increasing the depth of foundation ANSWER DOWNLOAD EXAMIANS APP
Building Construction A stair should not have pitch more than 25° 40° 30° 50° 25° 40° 30° 50° ANSWER DOWNLOAD EXAMIANS APP
Building Construction Mansard roof is a roof which slopes in Four directions without break in the slope on each side Two directions with break in the slope on each side Two directions without break in the slope on each side Four directions with break in the slope on each side Four directions without break in the slope on each side Two directions with break in the slope on each side Two directions without break in the slope on each side Four directions with break in the slope on each side ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 35 mm 25 mm 15 mm 45 mm 35 mm 25 mm 15 mm 45 mm ANSWER DOWNLOAD EXAMIANS APP