Building Construction The least bearing capacity of soil is that of Soft rock Hard rock Moist clay Coarse sandy soil Soft rock Hard rock Moist clay Coarse sandy soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction Brick nogging type of partition wall, is constructed by Reinforcing brick wall with iron straps Laying bricks as headers in cement mortar Laying bricks as stretchers in cement mortar Constructing brick work within a wooden framework Reinforcing brick wall with iron straps Laying bricks as headers in cement mortar Laying bricks as stretchers in cement mortar Constructing brick work within a wooden framework ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Newel posts Balustrades Balusters Railings Newel posts Balustrades Balusters Railings ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum depth of foundation in clayey soils is 0.9 m 0.5 m 1.2 m 0.7 m 0.9 m 0.5 m 1.2 m 0.7 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material ANSWER DOWNLOAD EXAMIANS APP