Building Construction A stair should not have pitch more than 25° 30° 40° 50° 25° 30° 40° 50° ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 1 meter 4 meters 2 meters 3 meters 1 meter 4 meters 2 meters 3 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 5 m 20 m 10 m 15 m 5 m 20 m 10 m 15 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical sides of a door and window openings provided in a wall, are known as Reveals Jambs Verticals None of these Reveals Jambs Verticals None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling All listed here Is not economical for holes of less than 10 cm Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel All listed here Is not economical for holes of less than 10 cm Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel ANSWER DOWNLOAD EXAMIANS APP