Building Construction The form work from the sides of beams can be removed only after 7 days 1 day 14 days 4 days 7 days 1 day 14 days 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling All listed here Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm All listed here Hinders the ground water observations and permeability test Is not suitable for deposits containing very coarse gravel Is not economical for holes of less than 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 25 to 30 cm 5 to 10 cm 15 to 20 cm 30 to 45 cm 25 to 30 cm 5 to 10 cm 15 to 20 cm 30 to 45 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/10th of the span 1/12th of the span 1/8th of the span 1/6th of the span 1/10th of the span 1/12th of the span 1/8th of the span 1/6th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Mosaic floor Chips floor Terrazzo floor Marble floor Mosaic floor Chips floor Terrazzo floor Marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular portion between any two adjacent arches and the tangent to their crowns, is Rise Spandril Haunch Soffit Rise Spandril Haunch Soffit ANSWER DOWNLOAD EXAMIANS APP