Building Construction The form work from the sides of beams can be removed only after 7 days 1 day 4 days 14 days 7 days 1 day 4 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used Pedestal pile Franki pile Vibro pile Pressure pile Pedestal pile Franki pile Vibro pile Pressure pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a rectangular foundation of width b, eccentricity of load should not exceed b/3 b/2 b/6 b/4 b/3 b/2 b/6 b/4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The columns of multi-storeyed buildings are designed to withstand the forces due to Wind loads Live loads Dead loads All of these Wind loads Live loads Dead loads All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement of supporting an existing structure by providing supports underneath, is known as Shoring Underpinning Piling Jacking Shoring Underpinning Piling Jacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Balustrades Railings Newel posts Balusters Balustrades Railings Newel posts Balusters ANSWER DOWNLOAD EXAMIANS APP