Building Construction The form work from the sides of beams can be removed only after 4 days 14 days 1 day 7 days 4 days 14 days 1 day 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 in 20 1 to 50 1 in 5 1 in 10 1 in 20 1 to 50 1 in 5 1 in 10 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling is the fastest method in case of Clay soils Sandy soil All of these Rocky soils Clay soils Sandy soil All of these Rocky soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as Grouting Laying Troweling Placing Grouting Laying Troweling Placing ANSWER DOWNLOAD EXAMIANS APP
Building Construction Crown is located at Highest point on the intrados of the arch Highest point on the extrados of the arch Skew-back of the arch None of these Highest point on the intrados of the arch Highest point on the extrados of the arch Skew-back of the arch None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower half portion between crown and skew back of the arch, is called Haunch Springing Spandril Soffit Haunch Springing Spandril Soffit ANSWER DOWNLOAD EXAMIANS APP